Reconstruction underway of state's oldest bridge
PRINCETON - Friday, July, 21, 2017
Rt. 206 is closed during the reconstruction of the the Stone Arch Bridge (and the adjacent Flood Channel Bridge) over the Stony Brook. Part of the bridge wall at left on the northbound traffic side of the bridge.
(Michael Mancuso | For NJ.com)
<div class='inline-sidebar' style='border: 1px solid rgb(205, 200, 177); padding: 10px; line-height: 16px; width: 350 px; font-family: Verdana,Arial,sans-serif; margin-bottom: 10px; float: none; margin-left: 0px; font-size: 12px;'><big><strong> To purchase prints of this photo, visit <a href='http://timesoftrenton.zenfolio.com/p778193850'>TimesofTrenton.zenfolio.com</a></strong></big></dIv>
Canon EOS 5D Mark III, f/11 @ 33 mm, 1/640, ISO 400, No Flash
Category:
Subcategory:
Subcategory Detail:
Keywords:
© Times of Trenton photos